• Mon - Sat 8:00 - 6:30, Sunday - CLOSED
Call Anytime

Dolmen Mall Lahore – Wall Façade

Dolmen Mall Lahore – Wall Façade



Dolmen Mall Lahore – Wall Facade

CLIENT NAME

Dolmen Group  

DESCRIPTION

 Wall Façade Works

PROJECT SITE

DHA Phase 6

PROJECT VALUE

100 million PKR

COMPLETION DATE

20-03-25


 

Scope of Work:

    1. Curtain Walling Glazed Façade Installation

        – Installation of complete curtain walling glazed façade (wall façade glass) with aluminum mullion transom and comprehensive sealant works.

        – Panel size: 1.5M x 3.0M

        – Total coverage area: approximately 50,000 square feet.

    1. Curtain Walling Glazed Façade Entrances

        – Installation of glass panels for main entrances, including glass door installation.

        – Total coverage area: 4,500 square feet.

    1. Aluminum Composite Panel (ACP) Cladding

        – Installation of ACP panels on the entire wall façade and arcade galleries of the mall.

        – Total coverage area: 120,000 square feet.

    1. Aluminum Standing Seam Roof Installation

        – Installation of corrugated aluminum sheets with a thickness of 2mm on the façade canopies (north, south, east, and west).

        – Total coverage area: approximately 48,000 square feet.

    1. 5. Steel Structure Installation for ACP Cladding

        – Installation of steel structure for gallery arcade ACP cladding.

        – Approximate weight: 47,000 kgs.

    1. Kings Span Pre-Insulated Sandwich Panels and steel

        – Installation of pre-insulated sandwich panels with supporting steel structure at the loading docks.

        – Approximate steel weight: 36,000 kgs.

     

Previous